Joined by the person in charge of the work, Eng. Jorge Ku and the director of entrepreneurship and markets, Karenina Sanchez, the municipal president personally supervised the works being carried out in the restroom area.
The works include floor repairs, faucets, doors, extractor fan, fan, lighting, wall slabs and baby changing table. In addition to the above, remodeling work has already been completed in the dining hallway area, which includes porcelain and ceramic tile flooring, as well as the installation of new ceilings and the application of black paint on the existing ones, and also a new electrical installation, installation of lighting and fans, application of paint on the facades and curtains, cleaning of pipes, replacement of drainage manhole covers, and the preparation and lining of the walls.
As part of this tour, Zacarías Curi greeted the people who were in the area and invited all vacationers to visit this place and enjoy the food that is part of the port’s gastronomy.
TYT Newsroom